United States Coast Guard Calumet Harbor Station
A renovation of 6,900 sf for one of the Federal
Governments Homeland Security base.

Harris
Recreation Center
Build out of administrative offices, gym, locker rooms and
kitchen. The pool was renovated installing up-to-date equipment and
mechanical systems.
|

University
of Illinois at Chicago- Halsted Street
This
interior build out within an historical building included redesigning
structural elements.

St.
Joseph Parish Center
A
complete build out is being done to the existing rectory to
accommodate new living quarters and parish offices
|

George
W. Collins High School
Existing classrooms were retrofitted to science labs while
simultaneously the auditorium was renovated and a new structural
plaza including a bridge over the loading dock.

St. Francis
of Assisi Church
This project was a
complete exterior and interior renovation and restoration of this
Historic church that was built in 1853.
|